4 Min read
March 25, 2025
Mivan shuttering is an advanced aluminum formwork system used for fast and efficient construction of residential and commercial buildings. Originally developed by Mivan Company Ltd., Malaysia, this technology is widely adopted in high-rise and mass housing projects due to its precision, durability, and speed. Compared to traditional shuttering methods, Mivan formwork offers higher reusability, cost savings, and superior surface finishes, making it a preferred choice for modern construction.
In this guide, we will explore the purpose of Mivan shuttering, types of shuttering, advantages, disadvantages, and applications in construction.
Mivan shuttering is designed to accelerate construction while maintaining structural integrity. Its primary purposes include:
Faster Construction: Reduces the project timeline by 30-40% compared to conventional methods.
Precision & Quality: Ensures smooth concrete surfaces, reducing the need for additional plastering.
Cost Efficiency: Reduces labor costs and material wastage.
Eco-Friendly: Reusable up to 250 times, minimizing construction waste.
Lightweight & Durable: Aluminum formwork is lightweight yet strong, allowing easy handling and multiple reuses.
Before diving into Mivan shuttering, let's explore different types of shuttering used in construction:
Made from wooden planks or plywood.
Affordable but less durable.
Used in small-scale projects.
Short lifespan due to moisture absorption.
Made from steel plates.
Highly durable and reusable.
Best for heavy structures like bridges and tunnels.
Expensive and heavy compared to other types.
Made from reinforced plastic.
Lightweight, eco-friendly, and reusable.
Best suited for modular and repetitive structures.
Made from high-strength aluminum panels.
Reusable up to 250 times.
Ideal for mass housing and high-rise projects.
High initial investment but cost-effective in large-scale projects.
Mivan shuttering follows a systematic construction process, ensuring efficiency and accuracy.
Site Preparation: Conduct soil testing and level the ground.
Assembling the Mivan Formwork Panels: Lightweight aluminum panels are connected to create walls and slabs.
Pouring Concrete: High-quality concrete is poured into the formwork.
Curing Process: The structure is allowed to set and strengthen.
Removal of Shuttering: Once the concrete has cured, the panels are carefully removed and reused.
✔ Faster Construction: Speeds up work by 30-40%, making it ideal for mass housing.
✔ Superior Finish: Ensures smooth walls and ceilings, reducing plastering costs.
✔ Highly Durable & Reusable: Aluminum formwork lasts up to 250 cycles, making it cost-effective.
✔ Lightweight & Easy to Handle: Aluminum is much lighter than steel, allowing easy installation.
✔ Reduces Labor Costs: Requires less skilled labor, cutting down expenses.
❌ High Initial Cost: Requires significant upfront investment, making it unsuitable for small projects.
❌ Limited Flexibility: Best suited for repetitive layouts, not for customized designs.
❌ Skilled Labor Required: Assembly and dismantling require trained professionals.
❌ Difficult to Repair: If aluminum panels get damaged, replacement can be costly.
Mivan shuttering is widely used in modern construction projects, including:
High-Rise Residential Buildings – Ensures fast and uniform construction.
Mass Housing Projects – Ideal for large-scale affordable housing developments.
Commercial Complexes – Used in offices, malls, and hotels.
Infrastructure Projects – Applied in bridges, flyovers, and metro stations.
Mivan shuttering is a game-changer in modern construction, especially for large-scale projects where speed and efficiency matter. It offers superior quality, faster completion times, and cost savings in the long run. However, it is not suitable for small-scale or highly customized projects due to its high initial investment and limited flexibility.
If you're planning a high-rise or mass housing project, Mivan shuttering is a smart choice for rapid and high-quality construction.
Mivan aluminum formwork can be reused up to 250 times, making it highly cost-effective for large projects.
The pre-fabricated aluminum panels allow quick assembly, reducing construction time by 30-40%.
While possible, it is not cost-effective for small projects due to high initial investment.
The cost varies by location and supplier but generally ranges from ₹1200-₹1500 per sq. meter ($15-$20 per sq. ft.).
It reduces labor dependency as fewer workers are required compared to traditional formwork methods.
Caleb Woods is an experienced content specialist and an editor at Boom & Bucket, blending his journalism background with expertise in the heavy equipment industry. He delivers engaging, informative content to help professionals stay informed and make smarter decisions in the machinery market.